打开APP
userphoto
未登录

开通VIP,畅享免费电子书等14项超值服

开通VIP
Lengthened Fuxing bullet train to debut on July 1

(People's Daily Online) 16:29, June 01, 2018

An elongated version of the Fuxing bullet train will begin operation on July 1, China Railway Shanghai Group announced on Thursday.

A Fuxing bullet train (File photo)

The new model of the bullet train has 16 carriages, eight more than the current Fuxing bullet trains in operation. It is 415 meters in length, and is able to carry 1,193 passengers at a speed of 350 kilometers per hour.

The rail department has been known to connect two 8-carriage bullet trains on special occasions such as during the Spring Festival rush, to ease pressure on the transport system. However, by connecting the two locomotives in the middle, the total capacity is lowered.

The lengthened Fuxing bullet train will replace the connection of the two locomotives with carriages, thus further increasing its capacity.

(For the latest China news, Please follow People's Daily on Twitter and Facebook)(Web editor: Hongyu, Bianji)


本站仅提供存储服务,所有内容均由用户发布,如发现有害或侵权内容,请点击举报
打开APP,阅读全文并永久保存 查看更多类似文章
猜你喜欢
类似文章
Sunday Streamline #32: Forgotten Chicagoans
每日新闻播报(December 23)
国家地理每日图片 - 2011年1月份(图)
美酒草莓蛋糕生日主题PPT模板
美俄:“复兴号”将跑出世界最高运营时速 成全球高铁里程碑
2023年福建省泉州市南安市中考英语质检试卷(含解析)
更多类似文章 >>
生活服务
热点新闻
分享 收藏 导长图 关注 下载文章
绑定账号成功
后续可登录账号畅享VIP特权!
如果VIP功能使用有故障,
可点击这里联系客服!

联系客服