打开APP
userphoto
未登录

开通VIP,畅享免费电子书等14项超值服

开通VIP
【PSC】2023年第1季 AMSA 滞留与缺陷的检查趋势总结,C篇

C. 关于Tokyo MoU (AMSA)滞留与缺陷的检查趋势总结

a) Detainable deficiencies

FIRE SAETY

- Em’cy fire pump inoperative

- Engine room fire dampers wasted and not effectively closing

- Fire main isolation valve unable to be closed

- Local fire fighting water mist system for the machinery spaces defective

- Steering gear room ventilators defective and unable to close

- Remote quick closing valves for F.O settling tank defective

- Funnel fire damper defective

- Ventilator in bow thruster room defective

- Ventilators in cargo hold defective
 ISM
- SMS as implemented onboard does not ensure vessel can effectively respond to emergency situations
- ISM detainable deficiency on the basis of many deficiencies
(Mostly engine parts related item such as AMS alarm, supply spare parts & etc.)
- Enclosed space entry and rescue drill defective
- Only one officer keeping navigation watch at night

- Not familiar with MARPOL(discharge food waste in prohibited area)

MLC(Working and Living Condition)
- Crew had not been paid in accordance with employment agreement

- Breach of minimum rest hour

Life Saving Appliances
- Lifeboat engine defective
- Lifeboat engine exhaust pipe wasted/defective, leaking exhaust gas into lifeboat
- Lifeboat on-load release mechanism defective
- Steering system for water jet propulsion system of rescue boat defective

- Defective drainage bag of rescue boat

Pollution Prevention
- Oily water separator 15ppm auto stop arrangement not operational
- Oil discharged over ship side
- Oily Water Separator defective due to abnormal condition of its 3-way valve
- Sewage Treatment Plant defective due to abnormal condition of its pressure motor

- Sewage Treatment Plant return line malfunctional

ILL
- Ballast tank air vent float ball defective
- Means for securing weather tightness for No.1 hatch cover defective (cleat, rubber packing, washer, cleat pin)

- No.1 to No.5 cargo hold access hatch(total 10 nos booby hatch) all operating lever dogs/cams for closing found in seized condition. Access hatches unable to close and hatch cover is not weather tight.

Safety of Navigation
- Latest charts not on board

- Crew unable to demonstrate operation of MF/HF on DC power

Others
- Automatic starting of emergency generator not working
- Failed to supply power to emergency switch board after starting emergency generator
- Overall bad maintenance on board
- Class Society not informed of various structural damage carried out by ship staff including repairs for cracks
- Handrails and stanchions on forecastle missing (approximately 4~5m)
- Main generators not properly maintained and unsafe to operate.
- Statutory annual survey out of window. Not conducted.

- Fish room temperature +2 degrees C. Meat and fish stored in fish room. Meat and Fish not fully frozen and is soft to the touch.

b) Items to be inspected thoroughly
FIRE SAETY
- Em’cy fire pump
- Engine room fire dampers
- Fire main isolation valve
- Local fire fighting water mist system for the machinery spaces
- Steering gear room ventilators

- Remote quick closing valves for F.O settling tank

ISM
- Fully implementation of ISM
- Satisfactory drills on enclosed space entry and rescue drill
- MLC(Working and Living Condition)
- Consistence in crew information between minimum crew certificate and labor contract

- Requirements of minimum rest hours

Life Saving Appliances
- Battery of lifeboat engine in fully charged and ready for emergency use
- Fixed eye for L/B embarkation ladder
- No obstacles to liferafts for ready for immediate use

- Limit Switch for Rescue boat davit

Pollution Prevention
- Familiarization with OWS (3 way valve and 15ppm alarm)
- Check of any oil leakage from OWS
- No Cooking oil discharged into the sea
- Records of 15ppm bilge alarm
- Operation of oily water separator and check for oil in discharge from the sampling line (please clean out the discharge pipe and filter)

- Sewage treatment operation (circulation line, hose between chambers, air compressor operation and pressure, air supply motor operation, installation of bio-filter etc.)

ILL
- Load Line Marking, Air pipe, Ventilator, weather-tight door
- Goose neck vent pipe for cargo hold
- Hatch cover, Hatch coaming corrosion condition
- Hatch cover rubber packing condition
- Small hatches condition on deck

- Remote dewatering system

Safety of Navigation
- Gyro repeater information can be seen from emergency steering position (close-up check during survey for new ship building)
- VDR alarm, fire detection system, Inmarsat, EPIRB function test
- Check of the latest charts and publications on board
- BNWS in proper operation
- Navigational lights
- GDMSS Battery in fully charged and good condition

- S/G Alarm

ISPS

- Gangway watch

Others
- Generator in proper condition and good operative
- Keep class society informed when major deficiencies identified on board
- Keep the relevant authorities timely informed when major deficiencies identified on board
- Marking ECDIS as education & classification statement as appropriate
- Handrails and stanchions in stable condition
好了,以上即为本期关于AMSA滞留与缺陷的检查趋势总结, 感谢您的阅读!
本站仅提供存储服务,所有内容均由用户发布,如发现有害或侵权内容,请点击举报
打开APP,阅读全文并永久保存 查看更多类似文章
猜你喜欢
类似文章
【热】打开小程序,算一算2024你的财运
澳大利亚PSC检查重点注意事项
PSC迎检| 必须注意这个最靓的仔!
Paris & Tokyo MoU PSC缺陷分析
【PSC】2023年上半年东京备忘录PSC检查缺陷整理与项汇总(下篇),补充174条17
PSC迎检| 刚刚的滞留,AMSA要败诉了!
AMSA 2020 PSC报告:缺陷增加1106个, 178艘船被滞留
更多类似文章 >>
生活服务
热点新闻
分享 收藏 导长图 关注 下载文章
绑定账号成功
后续可登录账号畅享VIP特权!
如果VIP功能使用有故障,
可点击这里联系客服!

联系客服