1.Check all trunkings are properly covered
检查所有线槽都全封盖
2. Check cable entry to box is wellterminated
检查进入配电箱的电览收尾良好
3. Check all wall openings are fully sealedwith fire
resistance materials
检查过墙洞囗填塞以防火材料
4.Check floor openings is fully sealed withfire resistance
materials
检查地面洞囗填充以防火材料
5.Check all cables are correctly tied toladder
检查所有电览正确地扣在览架上
6.Check all distribution boxes top port areproperly sealed
检查配电箱上方开口适当密封
7.Check all electrical boxes are correctlyearthed
检查配电箱正确地
8.Check earth bar inside ditribution boxsufficient
for all earth lines
检查配电箱接地桥尺寸足够供所有地线
9.Check all earth lines inside distributionboxes are
tightly secured
检查配电箱接地线在接桥己旋紧
10.Check all circuit breakers wiring areproper termination
and tightly secured
检查所有空开的电线已旋紧及良好收尾
11.Check circuit breakers tripping current arecorrectly set
检查各接触器跳闸保护设置正确
12.Check cable number marking is wrappedfor all cabling
检查线览标签套在线缆上
13.Check colour marking is correctly markedon cables
检查电缆上的相位颜色标签正确
14.Circuit breaker box is securely earthed
检查接触器盒接地旋紧
15.All cables are clearely labelled &inlined with room no.
所有电线标号与房号相符
16.Check BMS lighting control box isproperly set up.
检查楼宇自控灯光控制箱设置适当
17.Check room lighting is provided andworkable
检查房内已提供照度灯及可以工作
18.Check fire detector is provided
检查消防检测器己安装
19.Check switch room door is of fire ratedtype
检查电制门为耐火门等级
20 Check room door lock for functioning
检查门锁工作正常