5.3.1 Does the internal procedure require that all PH steel parts with any finish machined surfaces are cleaned prior to heat treatment and handled with clean gloves after cleaning? YES/NO

5.3.2 Do records indicate that the procedure is followed? YES/NO

5.4 Titanium Cleaning and Handling SECTION NA

5.4.1 Does the internal procedure for cleaning Titanium surfaces preclude the using of halogenated substances? YES/NO

5.4.2 Does the internal procedure require that parts with any finished surfaces be handled with clean gloves? YES/NO

5.4.3 Are the procedures followed? YES/NO

6. INSPECTION

6.1 Process Verification

6.1.1 Is each heat treatment cycle reviewed for job traceability, correct temperature, time at temperature and all other related parameters? YES/NO

6.1.2 Is this review performed by Quality Assurance or other designated personnel? YES/NO

6.1.3 Is the review documented in accordance with the customer requirements? YES/NO

6.1.4 Are the acceptance status and any test data recorded on the production documents only after the operation for that job has been completed? YES/NO

6.2 Sampling Plans SECTION NA

6.2.1 Does the supplier have a procedure that details all aspects of sampling inspection that is in accordance with all customer heat treating specification sampling requirements? YES/NO

6.2.2 Do all supplier heat treating sampling plans contain:

6.2.2.1 A method for the inspector to determine the quantity of product to check in the lot? YES/NO

6.2.2.2 Specified frequency and method of sampling? YES/NO

6.2.2.3 When to change to tightened or reduced plans? YES/NO

6.2.3 Are sampling plans approved by the customer, when required? YES/NO/NA

6.2.4 Is there documented training in the use of the sampling plan which includes sample size and selection, reduced and tightened plans, and when to implement them? YES/NO

6.2.5 Where sample inspection is permitted, does production documents indicate that customer requirements have been flowed down correctly and are met? YES/NO

7. PROCESS CONTROL TESTING

7.1 Does the Supplier have a Process Control System? YES/ NO

NOTE: The Supplier shall maintain a Process Control System that reviews all of the specifications that they process hardware to and the applicable process control testing requirements. The Supplier shall be able to show that those tests are scheduled and performed as required.

7.2 Hardness testing SECTION NA

7.2.1 For information only, does the supplier perform hardness testing? YES/NO

(INFO)

NOTE: If the Supplier performs hardness testing for acceptance of product, MedAccred AC8102/5 checklist shall be executed.

7.3 Metallography/Microhardness SECTION NA

7.3.1 For information only, does the supplier perform metallography and microhardness testing?

本站仅提供存储服务,所有内容均由用户发布,如发现有害或侵权内容,请点击举报
打开APP,阅读全文并永久保存
猜你喜欢
类似文章
我92年回家探亲,在火车上邂逅一个女大学生,只可惜她后来嫁给了别人
揭秘人格魅力的秘诀,让你成为人们羡慕的焦点!
0098《权力48法则》罗伯特・格林(1)
江南水乡
网络霸权:东亚地区的联盟动态 | 国政学人
误解太深:越南是一个小国?还是大国?
生活服务
热点新闻
分享 收藏 导长图 关注 下载文章
绑定账号成功
后续可登录账号畅享VIP特权!
如果VIP功能使用有故障,
可点击这里联系客服!

联系客服