Car Adornment Article Cosmetology Chapter--Paint Room 2
=========================
【Design term】
 
1, determine a reasonable configurations.
2, determine a reasonable average velocity spray booth air plane.
3, air supply, exhaust system a reasonable match to ensure the painting indoor positive pressure.
4, curtain thickness should be uniform, should pay attention to the structure of the form and distribution of the water supply line on the sink.
5, the lower the curtain plate to the sink from the surface to be reasonable.
6, washed atomizing nozzles and piping should be easy to remove, replace and clean up.
7, the settlement should be fully air-water separator and easy to clean.
 
=========================
【Term performance indicators】
 
-----------------
1 [brightness]
 
    Paint the room brightness required to achieve 800-1000 lux, and the need to use the D65 light source close to the lights, while the walls of the room should be matte white;
 
-----------------
2 [air traffic]
 
-----------------
3 [Filter effect]
 
    It depends on the type of cotton paint the roof, a general repair shop using the EU5 and EU6 two models, you can use the paint room when the sun light exposure in the upper room with usually very fine dust per square meter should be less than 5
 
-----------------
4 [wall sealing effect]
 
    Paint room must be sealed at the seams and there should be no accumulation of paint dust
 
-----------------
5 [guarantee positive]
 
    Under paint room should be slightly larger than the inlet air volume air flow, so that the paint room maintained at a positive pressure state
 
-----------------
6 [seal heating system]
 
    Around the burner and chimney should be sealed well, can not occur after burning putty
 
-----------------
7 [heating rate]
 
    Paint room rose to 60 ℃ from 20 ℃ time used is about l0-l5min, should also be aware that some are not allowed to paint room thermometer, the temperature of the room you want to paint the metal body of the subject when the measured temperature.
 
=========================
【[Equipment Terminology】
 
-----------------
1 [Clean grinding room]
 
Grinding room to meet the different needs of vehicle repair workshop use, the main function is to remove the dust from the repair shop, gas, ensuring a fresh working environment, improve service quality and protect the health of the production staff.
 
-----------------
2 [drying equipment]
 
There moisture drying, curing the coating and drying hot glue drying equipment. Heat using electricity, oil, steam, etc., equipped with high-quality instrument control, making the drying chamber, heating speed.
 
-----------------
3 [spray equipment]
 
Divided into: water spin, curtain, oil screens, no pump spray booth, dry spray booth for domestic and foreign advanced technology and years of experience in the construction of domestic crystallization, which applies to the bulk of the machinery industry in a variety of sizes bottom paint spraying needs.
 
-----------------
4 [anti-pressure safety devices]
 
Paint the room to ensure the pressure is too high, the door opens automatically heads to ensure the safety of the operator.
 
-----------------
5 [lighting]
 
Generally use the new design, no shadow when the paint room paint operations, in particular the use of professional paint room dedicated electronic ballasts, light intensity up to 800 lux, while still work when the power supply voltage as low as 180 volts.
 
-----------------
6 [senior air filter]
 
Two filter layer in the air filter out dust and other debris, dust and other debris to the surface without paint, paint the room and keep the air clean, and protect staff.
-----------------
7 [Auto throttle]
 
Painting on automatically when the throttle at 90 degrees to produce the inner loop, long holding time, fuel, power
 
-----------------
8 [stainless steel thermal switch]
 
With high-quality stainless steel welded, heat quickly, the heat transfer efficiency of over 95%. Fast heating, temperature uniformity.
 
-----------------
9 [Burner]
 
Can greatly improve energy efficiency and reduce pollution of the environment. With the support of a heat exchanger, coupled with scientific design, production, heat exchange rate of more than 85%. Features: heat transfer area, combustion, high thermal efficiency, safety and reliability.
 
-----------------
10. [Insulated fan]
 
Low noise, large air volume, thus ensuring the paint molding requirements, but also improve the utilization of paint; while still meeting the requirements for air cleanliness, to ensure the health of the staff.
 
-----------------
11 [control system]
 
Generally used in advanced components designed brand of machine performance is stable and reliable, easy to operate. Digital display, thermostat timer, ensure automatic thermostat painting under different temperature conditions, paint.
 
=========================
 
【Article is excerpted from: Web Search】
【Reserved Integrate / Just Reference】
【Translation is by The Network】
本站仅提供存储服务,所有内容均由用户发布,如发现有害或侵权内容,请点击举报
打开APP,阅读全文并永久保存 查看更多类似文章
猜你喜欢
类似文章
【热】打开小程序,算一算2024你的财运
PM-017-R0-生活区空调单元
收藏! WHO:非无菌制剂暖通空调GMP指南:第二部分
译言网 | 笔记本电脑降温5招
英文词汇-水泥词汇
建筑工程专业英语词汇 1
Be aware of air conditioning pollution
更多类似文章 >>
生活服务
热点新闻
分享 收藏 导长图 关注 下载文章
绑定账号成功
后续可登录账号畅享VIP特权!
如果VIP功能使用有故障,
可点击这里联系客服!

联系客服