ITU-T Study Group 11 Rapporteur Meetings (Study Period 2005 -2008)

SG 11 interim Rapporteurs meeting
April 2006

Rapporteur Meeting Date Location and Venue Term of reference
Question 1/11
(with the participation of Q.2/11, 3/11, 5/11, 7/11)
24 April 2006 Kobe, Japan (NGN-GSI)
  • Development of the signalling and control architectural requirements for NGN R1 protocol set 1
  • Progress work on draft recommendation NGN CPE Architecture
Question 2/11
(with Q1/11, 7/11 and 2/13 )
24, 26 April 2006 Kobe, Japan (NGN-GSI)
  • Progress work draft recommendation for User Profiles (Q.user-data)
  • Co-ordination between questions 7/11 and 2/13 to determine the split of work on user profiles. Development of the signalling requirements for the control of services in the NGN architecture
Question 3/11 25, 26, 27 April 2006 Kobe, Japan (NGN-GSI)
  • To progress the work on the Work Programme items related to NGN signalling requirements and control protocols, respectively:
  • Call/session control related items in Q.3/11
Question 5/11
(one joint session with Q.4/13)
25, 26 April 2006 Kobe, Japan (NGN-GSI)
  • To progress the work on the Work Programme items related to NGN signalling requirements and control protocols, respectively:
  • Resource and QoS control related aspects in Q.5/11
Question 7/11 26 – 27 April 2006 Kobe, Japan (NGN-GSI)
  • Progress work on Protocol set 1 for network attachment

See also the related NGN-GSI event Web page



SG 11 interim Rapporteurs meeting
July 2006

Rapporteur Meeting Date Location and Venue Term of reference
Question 1/11 20 July 2006 Geneva, Switzerland
(NGN-GSI)
  • Development of the signalling and control architectural requirements for NGN R1 protocol set 1
  • Progress work on draft recommendation NGN CPE Architecture
Question 2/11
(one session with Q.2/13
if needed)
20 July 2006 Geneva, Switzerland
(NGN-GSI)
  • Progress draft recommendation for User Profiles
    (Q.user-data)
  • Development of the signalling requirements for the control of services in the NGN architecture
Question 3/11 20 - 21 July 2006 Geneva, Switzerland
(NGN-GSI)
  • Progress work on Call/session control Work items of the Work Program with priority to items in NGN R1 protocol set 1
Question 7/11 20 – 21 July 2006 Geneva, Switzerland
(NGN-GSI)
  • Progress work on Protocol set 1 for network attachment
本站仅提供存储服务,所有内容均由用户发布,如发现有害或侵权内容,请点击举报
打开APP,阅读全文并永久保存 查看更多类似文章
猜你喜欢
类似文章
【热】打开小程序,算一算2024你的财运
极致的对话 | 汤桦建筑设计的2018
Using interior design to convey corporate identity.
美国Progress Rail将意大利子公司ECM更名为Progress Rail Signalling
ATV Arquitectos丨结构是光线的创造者
每日一句:积极乐观,勇往直前
高中英语句子背诵(转载)
更多类似文章 >>
生活服务
热点新闻
分享 收藏 导长图 关注 下载文章
绑定账号成功
后续可登录账号畅享VIP特权!
如果VIP功能使用有故障,
可点击这里联系客服!

联系客服