SAP PM 初级系列8 - PM 组织架构

SAP PM 初级系列8 - PM 组织架构

1,SAP PM模块的典型组织架构如下示:

2,SAP PM organizational structure includes the following organizational units(SAP PM模块组织结构包含如下的组织单元):

  • Client: Client is highest level of an organization structure. It includes all the subsidiaries within one corporate group.
  • Company Code: Each subsidiary is represented with a company code in SAP system. Each company code has its own balance sheet and P&L statement.
  • Plant: Plant is one the most important structures in SAP PM organizational structure. It is the place where manufacturing of products takes place. One company code can have multiple plants.
  • Maintenance Plant: Organizational unit where operational systems are installed is called a maintenance plant.
  • Maintenance Planning Plant: This is a plant at which the maintenance operations are planned. It is possible that requirements come from own plant or from another maintenance plant assigned to the maintenance planning plant. In most cases, the maintenance planning plant is same as the maintenance plant.

Cross-Plant Maintenance

  • Plant section: A maintenance plant can be divided into subparts which are known as plant sections. For example, a plant can be divided into production area, store, electrical substation, etc.
  • Location: Location is the place where a functional object is physically installed in a plant section. It is used for informative purposes.
  • Maintenance Planner Group: It is a group of employees responsible for planning and processing of maintenance tasks in a plant. A different maintenance planner group is created for each plant.
  • Work Center: Work center is an organizational unit where maintenance activities are performed. It belongs to master data. Work center defines where and when the maintenance operation will be performed. Work center is assigned in task list, maintenance order, and maintenance operation line items. Machine/group of machine or person/group of people can be represented as a work center.

3,A work center is used for different purposes as follows(工作中心有如下用处):

  • Costing: There is link between a cost center and a work center. Costs can be calculated if a work center is assigned in a maintenance operation because the link to the cost center provides the activity type. In activity type, the rates are maintained on a variable basis or as fixed rates.
  • Scheduling: Scheduling is used determine start and end dates of maintenance operations based on a predecessor or successor operation. During scheduling, the start date and end date are calculated based on formulas maintained in the work center.
  • Capacity Planning: The formulas related to capacity planning are stored in the work center. In capacity requirement planning, the required capacity for operation is determined from the available capacity in the work center.

--

2021-2-2 整理于长三角某市。

本站仅提供存储服务,所有内容均由用户发布,如发现有害或侵权内容,请点击举报
打开APP,阅读全文并永久保存
猜你喜欢
类似文章
【热】打开小程序,算一算2024你的财运
Excel教程:公历日期转农历的6个公式
手机怎么定位对方的手机所在位置?学会这个小窍门,定位再也不用愁
宏--战士宏--通用 老雷
潘长宏制作的四款GIF翻页图片
潘长宏制作的博客、图书馆首页可应用的访客与时间显示记录仪
视频制作师潘长宏制作的---【精美分隔线】
生活服务
热点新闻
分享 收藏 导长图 关注 下载文章
绑定账号成功
后续可登录账号畅享VIP特权!
如果VIP功能使用有故障,
可点击这里联系客服!

联系客服